Follow Us:
Federal Ministry of
Housing & Urban Development (FMHUD)
Federal Republic of Nigeria
Welcome To Federal Ministry Of Housing And Urban Development.
Minister Federal Ministry Of Housing And Urban Development Arc. Ahmed Musa Dangiwa.
Housing And Urban Development.
Inspection Tour Of Houses For The National Housing Scheme.
Housing And Urban Development.
Housing And Urban Development.
Housing And Urban Development.
Housing And Urban Development.
Aug
22
2025

LATEST PRESS


Dangiwa Marks 2 Years in Office

 

* Bold Reforms, Tackling Systemic Housing and Urban Development Challenges

 

The Federal Ministry of Housing and Urban Development today marks the second anniversary of the Honourable Minister, Arc. Ahmed Musa Dangiwa, in office. Since his appointment by President Bola Ahmed Tinubu, GCFR, on August 22, 2023, Arc. Dangiwa has in line with the Renewed Hope Agenda led a historic reset of Nigeria’s housing and urban development sector, rolling out bold reforms and practical solutions that are directly tackling systemic challenges and delivering results in record time.

 

One of the most pressing problems has been Nigeria’s housing deficit, conservatively estimated at over 17 million units. In response, the Ministry launched the Renewed Hope Housing Programme (REHHP), a three-tier model comprising Cities, Estates, and Social Housing. In just two years, over 10,000 housing units have been commenced across 14 states and the FCT—an unprecedented pace compared to the 3,500 units delivered in the eight years before this administration. Flagship projects include a 3,112-unit Renewed Hope City in Karsana, Abuja; a 2,000-unit City in Ibeju-Lekki, Lagos; a 1,500-unit City in Kano with an additional 500-unit estate; and 250-unit estates in twelve states ranging from Osun and Delta to Katsina and Nasarawa.

 

Linked to the housing deficit is the challenge of deteriorating slums and decaying urban infrastructure. To reverse decades of neglect, the Ministry has implemented the National Urban Renewal and Slum Upgrade Programme (NURSUP), which has already transformed more than 150 communities nationwide with rehabilitated roads, drainages, clean water, solar electricity, schools, and healthcare centres.

 

Another obstacle has been the weakness of Nigeria’s mortgage and housing finance system, which for decades made homeownership unaffordable for most Nigerians. Under President Tinubu’s directive, reforms of the Federal Mortgage Bank of Nigeria (FMBN) and the Federal Housing Authority (FHA) have strengthened and expanded single-digit mortgages, zero-down-payment rent-to-own schemes, and innovative public-private partnership models that have mobilised over ₦70 billion in private capital for housing delivery.

 

For low-income and vulnerable Nigerians, who have historically been excluded from the housing market, the Ministry’s proposed Renewed Hope Social Housing Programme represents a bold new response. Its target is to deliver 77,400 affordable homes—100 in each of the 774 Local Government Areas of Nigeria with an affordability based pricing model. Beyond shelter, this initiative is expected to generate over 2 million jobs, empower local economies, and spread development beyond major cities into rural and peri-urban communities.

 

But building homes is not enough without secure access to land. Today, over 96% of land in Nigeria remains untitled and undocumented, locking away billions in potential wealth as “dead capital.” To address this, the Ministry is working with stakeholders to implement the Nigeria Land Titling, Registration and Documentation Programme (Land4Growth), which will digitise registries, streamline approvals, and unlock more than $300 billion in dormant assets. This represents the most strategic and impactful initiative that would accelerate the actualization of the Renewed Hope Target of a  $1Trillion Dollar GDP for the country. 

 

Another gap that long constrained effective housing delivery in Nigeria was the absence of credible, reliable data. Planning and investment decisions were often made in the dark. To fix this, the Ministry led efforts with industry stakeholders to establish the National Housing Data Centre (NHDC) Project —a centralised digital repository of housing, land, and urban development data. The NHDC is at advanced stage of providing real-time, evidence-based insights to guide government policy, attract private sector investment, and support international partners. For the first time, Nigeria is building a modern, data-driven housing ecosystem where progress can be tracked transparently and decisions made on solid evidence

 

Equally critical has been the spiralling cost of building materials, which pushes homeownership further out of reach. The Ministry’s response has been a bold plan to establish Building Materials Manufacturing Hubs in all six geo-political zones. These hubs would boost local production, reducing dependence on imports, cutting costs by up to 25%, and creating thousands of manufacturing and logistics jobs.

 

Years of housing fraud and abandoned projects also eroded public trust in government-backed housing schemes. To restore confidence, the Ministry has finalized a Housing Fraud Reporting Platform (HFRP) to enable citizens to report fraudulent developers and schemes. In addition, the Safeguarding FG Lands Initiative, launched with the Nigeria Police, will lead to the recovery of billions of naira worth of encroached Federal Government land for redevelopment into housing and infrastructure projects.

 

At the same time, the shortage of skilled workers in the construction sector has been a major barrier to quality and timely housing delivery. Through the National Artisan Skills Acquisition Programme (NASAP – CraftHub), thousands of young Nigerians would be trained as carpenters, plumbers, masons, and electricians and directly linked to housing projects nationwide.

 

To sustain momentum, the Ministry has also deepened partnerships with international development finance institutions. A landmark agreement with Shelter Afrique Development Bank will finance 5,000 affordable homes, while collaborations with UN-Habitat, World Bank would see the channeling technical and financial support to scale housing and urban reforms across the country.

 

Reflecting on this milestone, Arc. Dangiwa said:
 

“We inherited a housing sector riddled with systemic challenges. In just two years, through the support of Mr. President and our partners, we have rolled out strategic programmes that are delivering results. We are not just building houses; we are building hope, dignity, and prosperity for millions of Nigerians. And we are only just beginning.”

 

As the Honourable Minister marks his second year in office, the Ministry reaffirms its commitment to scaling up delivery under the Renewed Hope Agenda, ensuring that every Nigerian, regardless of income or status, can aspire to own a decent and dignified home.

May
22
2018

National Housing Programme Designed to Integrate Persons Living with Disability — Minister The National Housing Programme (NHP) is also designed for the integration of persons living with disabilities through inclusive building designs with ramps for mobility and interaction, an official says. The Minister of State II for Power, Works and Housing, Alhaji Suleiman Zarma, made the fact known on Tuesday during an inspection of construction at NHP site in Ado-Ekiti. Zarma in the company with some ministry officials was on an assessment tour of Federal Government roads and housing projects in the South-West Geo-Political Zone. The NHP is designed to suit different categories of people, including persons with disability, through provision of ramps to ease movement in the buildings. But in Ado-Ekiti, the structures were designed in such a way that persons living with disability are restricted to the ground floor. During the inspection, the minister said that people living with disabilities should not be restricted to the ground floor and should be allowed to interact freely. “In the world over now, people living with disabilities are integrated without being segregated. So there is no point to say that you have them only on the ground floor, that is another phase of segregation. “They should be able to go to all the floors and to all the levels of the building; they should be accommodated to carry out their activities. Zarma, a surveyor, urged officials in-charge of NHP in Ekiti, to ensure that designs suitable for persons with disability were captured very well in the next phase of NHP. “On the staircases, there will be strips or ramps that will cater for their movement. “They should not segregate the people with disabilities by restricting them to the ground floor; they should be allowed to go up and interact,’’ he noted. The NHP Team Leader in the state, Mr Segun Dossou, noted that due to an initial setback of relocation, the 70 housing units being constructed began late but was nearing completion. The architect assured the minister that the design for the second phase which would commence soon would go beyond the ground floor and extend to others to accommodate the people living with disabilities. He said all the contractors were mobilised and reported to the site except one that was handling two number blocks of three bedrooms who was yet to report for site handing over. According to him, the contractor has been served a warning letter to do so with a view to commencing the process of determining his contract. “The water infrastructure contract is already at 80 per cent completion with the drilling of four boreholes, installation of ground and overhead tanks and construction of water treatment plant. “The road infrastructure contract progress include completion of site survey, setting out of roads, cutting and bending of re-enforcement are on-going with view to commencing concrete works on the drainage. “External electrification progress includes the completion of erection of poles and construction of housing for transformer sub-stations while cable line installation is on-going. Dossou said that the project also created jobs and wealth for not only the building professionals and contractors but 1,500 skilled and unskilled artisans. The representative of the contractors, Mr Raji Kehinde, also appealed to the ministry to make funds faster to avoid delay in the completion of the project. One of the indigenes of the locality, Mr Femi Adetifa, expressed joy over the housing development in the state and called for continuity by the Federal Government. The minister also inspected the on-going construction of N3.3 billion Federal Secretariat Complex, located at New Iyin Road, Ado-Ekiti, by Messrs Deux Project Ltd. with 20 per cent of the job completed. Source: (NAN) ...

May
15
2018

FG Teams Up With State Governments On Infrastructure Development Nationwide – Fashola Federal Government has no objection in States assisting to develop the road infrastructure located within their domains provided the terms of reference as provided by the Federal Government are respected. This will go a long way in deepening the dividends of democracy at the grassroots. The Minister of Power, Works and Housing, Babatunde Raji Fashola stated this at the Government House, Kebbi and Jigawa States while being received by the Governors, Sen. Atiku Abubakar Bagudu and Mohammed Badaru Abubakar respectively at the just concluded 2 – day inspection tour of on-going projects in the two States which commenced 8th May, 2018. Fashola had inspected the National Housing Programmes in the two states as well as the 108km Kalgo-Bunza-Kamba-Peka Road which terminates at the nations border with Niger Republic on the first day of his visit as well as paid courtesy calls on the two Governors. A total of 93km stretch of the Kalgo-Bunza-Kamba-Peka-Niger Republic Border Federal road was rehabilitated with asphalt overlay by the Kebbi State Government at the sum of N1,041,753,716.17 awarded to Messrs. CGC Nigeria Limited and this has since been reimbursed by the Federal Government while 15km of the road is still outstanding. The Minister was impressed with the standard of work and noted that the Federal Government remains committed to partnering with any state government that showed concern in providing critical infrastructure for the benefit of all citizens. While still in Kebbi, Fashola also inspected the on-going rehabilitation of Sokoto-Tambuwal-Jega-Birnin Yauri (Sokoto/Kebbi/Niger States) phase 1 Section 11: Jega-Birnin Yauri Road (186km) which is only 22.84% completed. At the pilot scheme of the National Housing Programmes (NHP) in both states which had a total of 38 Blocks of 76 flats each, comprising 3,2 and 1 bedroom flats, with some already completed and delivered by the contractors and others at different stages of completion, Fashola stated that the Federal Government will embark on a full scale housing economy at the end of the pilot scheme which is bound to create more than the 1,000 workers presently employed at each site in the 33 States where the NHP is currently active. He further stated that it will also triple the ecosystem of trade and commerce at the sites which has improved the economies and financial capacities of the locals and communities around the NHP sites nationwide. The Governor of Kebbi State, Sen. Artiku Abubakar Bagudu in response offered the Federal Government as much land as would be required for the full take-off of the programme and also thanked the Federal Government for the speedy response at reimbursing the State for the Kalgo-Bunza-Kamba-Peka-Niger Republic Border road. He noted that the Federal Government will seldom use the road but the indigenes of the state, surrounding states, border nations and other road users will enjoy the road. Also responding, the Jigawa State Governor, Abubakar Badaru invited the Minister to help commission 8 of the 10 completed state infrastructure stating that Mr. President had offered to commission two of the projects. He invited the Minister to also inspect the 1,300km road projects completed by his administration as a way of boosting transportation of agricultural products in the state. Fashola concluded his 2-day tour by inspecting the on-going rehabilitation of 32.8km Hadeja-Nguru Road Phase 11 in Jigawa State by Messrs. Mothercat Nig. Ltd. which is currently at 84.93% completion. ...

First First First

PUBLIC ANNOUNCEMENT


Jun
20
2025

PUBLIC ANNOUNCEMENT


Click To View: RENEWED HOPE HOUSING PORTAL

PHOTO NEWS


Aug
13
2025

WORKSHOP ON NATIONAL BUILDING SAFETY AND STRUCTURAL INTEGRITY INITIATIVE (NBSSII), WEDNESDAY, 13TH AUGUST,  2025.

workshop on National Building Safety and Structural Integrity Initiative (NBSSII), Wednesday, 13th August,  2025.

Click To View More Pictures


PHOTO NEWS


Aug
13
2025

FROM NIGERIA LAND TITLING, REGISTRATION, DOCUMENTATION PROGRAMME, TUESDAY, AUGUST 12TH, 2025, EKO HOTEL, LAGOS.

From Nigeria Land Titling, Registration, Documentation Programme, Tuesday, August 12th, 2025, Eko Hotel, Lagos.

Click To View More Pictures



Other Agencies